1. Plumbing installed and sheetrock installed
2. Outside column being fixed
3. Paint needs touching up everywhere
4. Appliances need to be set up and tested
5. Glass needs to be cut for windows
Woody, Dave Smith's brother, will be plumbing the shower and install the toilet on Wed. May 25th
Hole in bathroom wall repaired
Bathroom plumbing needs to be finish then sheetrock finish then Bathroom painted
Need T1-11 for hole in siding and 2x4's sheetrocked for bathroom prep in New tub installation.
page=1&callback_module_id=groups&callback_item_id=23&year=&month=
Load More